Two things people want before they commit: what the equipment on their roof actually does, and what the four weeks between a phone call and a running system involve. Both are below.
Select any part of the system to see what it does and how it is specified.
N-type monocrystalline panels convert daylight to DC electricity. Layout is set by roof orientation, tilt and shading, with panels grouped into strings that behave the same way through the day.
Converts DC from the roof into 230 V AC for the house, and decides in real time whether power goes to your appliances, the battery or the grid. Hybrid units handle both solar and battery.
Your switchboard is where the system ties into the house. It usually needs a dedicated solar circuit, isolators and, on older boards, an upgrade before the system can be connected.
Lithium iron phosphate storage for the solar you do not use during the day. It charges once the house is covered and discharges through the evening peak. A backup circuit can keep nominated loads running.
Appliances draw from solar first, then the battery, then the grid. Shifting heavy loads such as hot water, pool pumps and dishwashers into daylight hours is the cheapest way to lift self-consumption.
Anything left after the house and battery are covered is exported through your meter and credited at your feed-in rate. Your network sets an export limit, so the system is configured to stay inside it.
Generation, consumption, battery state and grid flow are logged and sent to an app. Microinverter and optimiser systems report per panel, so a shaded or failing panel is visible rather than guessed at.
Equipment we install: Trina Solar and AIKO panels, Sungrow and FoxESS inverters and batteries. Which model goes on your roof depends on the design, and the full datasheet for every component is attached to your quote.
Seven stages, about four weeks. Select a stage to see what happens and what is needed from you.
You send through your details and a recent bill. We check your address against our service area, look at your usage pattern and tell you whether solar, a battery, or both are worth quoting before anyone visits.
We measure the roof, check how it is built and look at everything the system has to connect into. This is the step that decides whether a design is realistic, so it is done in person rather than from satellite imagery.
Your usage is modelled against simulated output for your specific roof, in 15-minute intervals across a full year. That produces the panel count, inverter size and battery size, and shows how much of your own generation you would actually use.
Before anything is installed the system has to be approved for connection and the rebate paperwork has to be set up. We lodge it, track it and tell you when it clears. Nothing is ordered until you have accepted the quote.
A crew arrives in the morning, isolates the supply, mounts the racking and panels, runs the DC and AC cabling, installs the inverter and battery, and ties into your switchboard. Power is off for part of the day while the switchboard work is done.
The system is tested end to end, the inverter is configured to your network settings, and your monitoring is set up on your phone before anyone leaves. We show you what normal looks like so an abnormal day is obvious later.
Monitoring keeps running after handover. If output drops away from what the design predicted, that shows up in the data, and we would rather find it than have you notice it on a bill three months later.
Common questions about performance, blackouts, export and warranty.
Modern Tier 1 panels lose around 1% of output in the first year, then roughly 0.35–0.4% a year after that. Most are still producing 87% or more of their original output at 30 years, which is what the performance warranty guarantees.
Without a battery configured for backup, a grid-tied system shuts down during an outage as a safety requirement, even in full sun — so it cannot feed power into lines crews may be working on. A battery with a backup circuit keeps nominated loads running.
Yes. Your distribution network service provider sets an export limit, commonly around 5kW on a standard single-phase residential connection, though it varies by network and can sometimes be raised on application. It caps what you can sell back, not what you can generate and use yourself.
Three separate things: the product warranty on the hardware itself, the performance warranty on output over time, and our workmanship warranty on the installation. They run on different timeframes and we set all three out in writing before install.